{"id":487,"date":"2014-02-04T15:49:34","date_gmt":"2014-02-04T11:49:34","guid":{"rendered":"https:\/\/www.qualityengineersguide.com\/?p=487"},"modified":"2022-02-12T17:29:44","modified_gmt":"2022-02-12T09:29:44","slug":"understanding-about-checklist","status":"publish","type":"post","link":"https:\/\/www.qualityengineersguide.com\/understanding-about-checklist","title":{"rendered":"Understanding About Checklist"},"content":{"rendered":"<p>There was one search on this site; it appeared to be like this &#8220;Definition of Checklist and How to build.&#8221; Let us give a response for that search by making a post for that alone, it may have been a kind of request.<\/p>\n<p>I am going to give a definition and ways on how to build a checklist and I am going to show also the sample checklist. But first, let me give a definition of Checklist.<\/p>\n<h3><strong>Checklist Definition<br \/>\n<\/strong><\/h3>\n<p>The checklist is a list of items to be noted or checked in a completed part of the activity. It is always attached with the <a href=\"https:\/\/en.wikipedia.org\/wiki\/Inspection\" target=\"_blank\" rel=\"noopener\">Inspection<\/a> Request (IR) to be signed-off by concern parties once the inspection is accepted.<\/p>\n<p>A Checklist shall be made for each activity on site. It is the basis of confirmation that a part of activity has been done as per the method or procedure of the work.<\/p>\n<p>The checklist shall be done after the development of the method statement and <a href=\"https:\/\/www.qualityengineersguide.com\/understanding-about-inspection-and-test-plan-itp\">Inspection and Test Plan<\/a>.<\/p>\n<p>Here is a sample of a Checklist for Block Works activity.<\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/www.qualityengineersguide.com\/wp-content\/uploads\/Block-Work-Image.jpg\"><img decoding=\"async\" class=\"aligncenter wp-image-512\" src=\"data:image\/gif,GIF89a%01%00%01%00%80%00%00%00%00%00%FF%FF%FF%21%F9%04%01%00%00%00%00%2C%00%00%00%00%01%00%01%00%00%02%01D%00%3B\" data-layzr=\"https:\/\/www.qualityengineersguide.com\/wp-content\/uploads\/Block-Work-Image.jpg\" alt=\"ChecklistBlockWorkImage\" width=\"700\" height=\"525\" title=\"\"><\/a><\/p>\n<p>&nbsp;<\/p>\n<h2 id=\"tablepress-CHKList-name\" class=\"tablepress-table-name tablepress-table-name-id-CHKList\">Checklist for Block Works<\/h2>\n\n<table id=\"tablepress-CHKList\" class=\"tablepress tablepress-id-CHKList tbody-has-connected-cells\" aria-labelledby=\"tablepress-CHKList-name\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">ITEM<\/th><th class=\"column-2\">Ativities\/Items to be Inspected<\/th><th class=\"column-3\">Conforms (YES\/NO)<\/th><th class=\"column-4\">Contractor<\/th><th class=\"column-5\">Engineer\/<br \/>\nConsultant<\/th><th class=\"column-6\">Client\/<br \/>\nEmployer<\/th><th class=\"column-7\">Remarks<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td colspan=\"6\" class=\"column-1\">a). Preparatory Inspection<\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">1<\/td><td class=\"column-2\">MS\/ITP\/Shop Drawing Approved<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">2<\/td><td class=\"column-2\">Materials Approved by Client or Engineer<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td colspan=\"6\" class=\"column-1\">b. Final Inspection<\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">1<\/td><td class=\"column-2\">Check Setting out and Surface Preparation<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">2<\/td><td class=\"column-2\">Blocks are dampened with water before installation<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">3<\/td><td class=\"column-2\">Mortar Mix as per approved MS<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">4<\/td><td class=\"column-2\">Number of course as specified and approved<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">5<\/td><td class=\"column-2\">Blockwork joints were properly filled with mortar and rake to form key for plaster<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">6<\/td><td class=\"column-2\">Wall ties are fixed at junctions of concrete walls and columns and all requiered<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">7<\/td><td class=\"column-2\">Horizontal stack provided as per method statement<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">8<\/td><td class=\"column-2\">All required MEP embedments and openings are in placed<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">9<\/td><td class=\"column-2\">Alignment and verticality checked<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\">10<\/td><td class=\"column-2\">Compressible filler and sealant provided<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\">11<\/td><td class=\"column-2\">Curing is made<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td colspan=\"6\" class=\"column-1\">Comments\/ Discrepancies (If any:) <\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-CHKList from cache -->\n<p>That&#8217;s how to build a checklist. If you have suggestions please feel free to comment and leave your reply.<\/p>\n<p>To those who want to request a soft copy of the complete format <del>(excel format) of this checklist please comment or leave your request below and I&#8217;m going to send to you via email<\/del>.\u00a0you can now download from here\u00a0<a href=\"https:\/\/www.qualityengineersguide.com\/wp-content\/uploads\/Check-list-Sample-Format.xlsx\">Check list Sample Format<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>There was one search on this site; it appeared to be like this &#8220;Definition of Checklist and How to build.&#8221; Let us give a response for that search by making a post for that alone, it may have been a kind of request. I am going to give a definition and ways on how to build a checklist and I am going to show also the sample checklist. But first, let me give a definition of Checklist. Checklist Definition The checklist is a list of items to be noted or checked in a completed part of the activity. It is <\/p>\n","protected":false},"author":1,"featured_media":512,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[55,49],"tags":[45],"class_list":{"0":"post-487","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-checklists","8":"category-general","9":"tag-checklist","10":"has_thumb"},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.qualityengineersguide.com\/wp-json\/wp\/v2\/posts\/487","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.qualityengineersguide.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.qualityengineersguide.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.qualityengineersguide.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.qualityengineersguide.com\/wp-json\/wp\/v2\/comments?post=487"}],"version-history":[{"count":0,"href":"https:\/\/www.qualityengineersguide.com\/wp-json\/wp\/v2\/posts\/487\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.qualityengineersguide.com\/wp-json\/wp\/v2\/media\/512"}],"wp:attachment":[{"href":"https:\/\/www.qualityengineersguide.com\/wp-json\/wp\/v2\/media?parent=487"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.qualityengineersguide.com\/wp-json\/wp\/v2\/categories?post=487"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.qualityengineersguide.com\/wp-json\/wp\/v2\/tags?post=487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}